|
|
John Readhead's Shipyard
Ship built at the Readhead Yard under Swan Hunter & Tyne Shipbuilders Ltd. The Launch Party arrives as the band plays.
The Stern entering the river
The Tugs stand by
The Bow entering the river
The Tugs move in
The Tugs move in to secure the tow lines
The ship slowly turns
The ship slowly turns into position for bringing alongside
The ship is almost ready for bringing alongside the quay |
|